배너 닫기
맨위로

Leeza SOHO opens with the world’s tallest atrium, Beijing, China 2

베이징 리자로드 금융지구를 밝히는 은은한 조명체이자 194m의 역동적인 아트리움을 품고 있는 207m 초고층타워 ‘베이징 리자 소호(Leeza SO...

등록일 2019년11월20일 11시42분 URL복사 기사스크랩 프린트하기 이메일문의 쪽지신고하기
기사글축소 기사글확대 트위터로 보내기싸이월드 공감 네이버 밴드 공유

Leeza SOHO opens with the world’s tallest atrium, Beijing, China 2

베이징 리자로드 금융지구를 밝히는 은은한 조명체이자 194m의 역동적인 아트리움을 품고 있는 207m 초고층타워 ‘베이징 리자 소호(Leeza SOHO)’

Located on Lize Road in southwest Beijing, Leeza SOHO tower anchors the new Fengtai business district - a growing financial and transport hub between the city centre and the recently opened Beijing Daxing International Airport to the south. The new business district is integral to Beijing’s multi-modal urban plan to accommodate growth without impacting existing infrastructure networks in the centre of the city.

This 45-storey 172,800m² tower responds to demand from small and medium-sized businesses in Beijing for flexible and efficient Grade A office space.

Adjacent to the business district’s rail station at the intersection of five new lines currently under construction on Beijing’s Subway network, Leeza SOHO’s site is diagonally dissected by an underground subway service tunnel.

Straddling this tunnel, the tower’s design divides its volume into two halves enclosed by a single facade shell. The emerging space between these two halves extends the full height of the tower, creating the world’s tallest atrium at 194.15m which rotates through the building as the tower rises to realign the upper floors with Lize road to the north.






This rotation of the atrium intertwines Leeza SOHO’s two halves in a dynamic ‘pas de deux’ with connecting skybridges on levels 13, 24, 35 and 45; its glaced facade giving panoramic views across the city.

Leeza SOHO’s atrium acts as a public square for the new business district, linking all spaces within the tower and providing varying views due to its twisting, sculptural form; creating a fantastic new civic space for Beijing that is directly connected to the city’s transport network.

The atrium brings natural light deep within the building, acting as a thermal chimney with an integrated ventilation system that maintains positive pressure at low level to limit air ingress and provides an effective clean air filtration process within the tower’s internal environment.







 

Leeza SOHO’s double-insulated, unitised glass curtain wall system steps the glazing units on each floor at an angle, providing narrow ventilating registers to draw outside air through operable cavities where required; creating extremely efficient environmental control for each floor.


The two halves of the tower shade the atrium’s public spaces, while the double-insulated low-e glazing maintains a comfortable indoor environment in Beijing’s extreme weather conditions. With a u-value of 2.0 W/m²K, the glazing has a shading coefficient of 0.4. The tower’s overall external envelope u-value is 0.55 W/m²K.

At the forefront of 3D Building Information Modelling (BIM) in design, construction management and building operations, Zaha Hadid Architects and SOHO China have implemented proven technologies to reduce the energy consumption and emissions at each of their four collaborations, totalling 15 million square feet (1.4 million sq. m) of mixed-use urban space in Beijing and Shanghai.

Designed to achieve LEED Gold certification by the US Green Building Council, Leeza SOHO’s advanced 3D BIM energy management system monitors real-time environmental control and energy efficiency. These systems also include heat recovery from exhaust air and high-efficiency pumps, fans, chillers boilers, lighting and controls. The tower incorporates water-collection, low-flow rate fixtures and grey water flushing as well as an insulating green roof with photovoltaic array to harvest solar energy.

2,680 bicycle parking spaces, with lockers, shower facilities and dedicated charging spaces for electric and hybrid cars are located below ground; while low volatile organic compound materials are installed throughout Leeza SOHO to minimise interior pollutants and high efficiency filters remove particulates via the air-handling system.

>>Patrik Schumacher Architect, 자료_ ZHA, Photograph by Hufton+Crow

 

 

Project Team

Architect: Zaha Hadid Architects (ZHA)

Design: Zaha Hadid, Patrik Schumacher

ZHA Project Director: Satoshi Ohashi

ZHA Project Architect: Philipp Ostermaier

ZHA Project Associates: Kaloyan Erevinov, Ed Gaskin, Armando Solano

ZHA Project Team: Yang Jingwen, Di Ding, Xuexin Duan, Samson Lee, Shu Hashimoto, Christoph Klemmt, Juan Liu, Dennis Brezina, Rita Lee, Seungho Yeo, Yuan Feng, Zheng Xu, Felix Amiss, Lida Zhang, Qi Cao

ZHA Competition Directors: Satoshi Ohashi, Manuela Gatto

ZHA Competition Team Lead Designers: Philipp Ostermaier, Dennis Brezina, Claudia Glas Dorner

ZHA Competition Team: Yang Jingwen, Igor Pantic, Mu Ren, Konstantinos Mouratidis, Nicholette Chan, Yung-Chieh Huang

Executive Architect: Beijing Institute of Architectural Design (China)

 

Consultants

Structure: Bollinger + Grohmann (Stage 0,1); China Academy of Building Research (Stage 2); Beijing Institute of Architectural Design (Stage 3,4)

Facade: Konstruct West Partners (Stage 2); Kighton Facade (Stage 3,4); Yuanda (Stage 3,4)

MEP: Parsons Brinkerhoff (Stage 2); Beijing Institute of Architectural Design (Stage 3,4)

Lighting: J+B Studios Architectural Design (Stage 2); Light Design (Stage 2,3); Leuchte (Stage 4)

Landscape: Zaha Hadid Architects (Stage 2,3); Ecoland (Stage 4)

Interiors: Zaha Hadid Architects (Stage 2,3); HuaTeng (Stage 4)

Signage: Dongdao (Stage 4,5)

LEED: Schneider Electric (Stage 2)

Helipad: Zhi Jiu (Stage 3,4)

Traffic Consultant: Dazhengtong (Stage 3,4)

Quantity Surveyor: Liby Limited (Stage 2)

Site Supervision: Shuangyuan (Stage 5)

Modelmaker: Gaojie (Stage 2,3)

Visualisation: MIR (Stage 3,4), Cosmoscube (Stage 3,4), Frontop (Stage 2), Gozen (Stage 2), Zero (Stage 2), Atchain (Stage 4)


 

Top of façade: 199.99m

Top of atrium: 194.15m

Standard floor to floor height: 4.1m

Number of floors: 45 floors above ground, 4 floors below ground

Site area: 14,365m²

Gross floor area: 172,800 m²

Project Start Date: October 2013

Siteworks Start Date: April 2015

Completion Date: 19 November 2019

안정원 기자 이기자의 다른뉴스
올려 0 내려 0
유료기사 결제하기 무통장 입금자명 입금예정일자
입금할 금액은 입니다. (입금하실 입금자명 + 입금예정일자를 입력하세요)